By firm type

Proposal software for civil engineering firms

Civil engineering firms are selected on qualifications, so most of a proposal is evidence: who holds which registration, who ran which project, for which agency. RFPM keeps that evidence as one record per engineer and per project, and produces the resumes and project sheets every SOQ, RFQ, DOT prequalification, and SF330 needs.

Built for
Civil, transportation, water, and multidiscipline engineering firms and CM consultants, 15 to 200 staff
The work
Municipal and county SOQs, RFQs, state DOT prequalification, on-call, SF330
Produces
Tailored resumes, project sheets, and a first draft in the firm's template for your team to review
Not for
Software, IT, or other firms outside AEC; fee proposals, e-signatures, subcontractor bids
One record, every format

Each engineer is described once, then in whatever shape the owner asks for

A county SOQ, a DOT prequalification, and an SF330 ask for the same engineer in three layouts and three emphases. In RFPM the engineer is one record. Each solicitation draws the fields it needs and renders them in its own format.

app.rfpm.ai/staff/maria-alvarez

Maria Alvarez, PE

Senior transportation engineer, Ridgeline Civil Group

Registrations
PE in California and Nevada
Work categories
Roadway, drainage, traffic signals
Project roles
Project manager on 9, design lead on 5
Clients
Fresno County, Caltrans District 6, City of Visalia
Experience
14 years, 8 with the firm
Education
MS Civil Engineering, UC Davis
Pick a solicitation to see which fields of the record it draws on. Sample engineer and firm; the layout in the workspace differs. Update the record once and the next document generated from it uses the update.
The work it replaces

The work a civil engineering proposal actually contains

In most firms the evidence lives in the last submittal. A coordinator finds the nearest past proposal, copies resumes and project sheets into the new template, swaps projects, fixes the formatting that broke, and checks that the same person is described the same way on every page.

RFPM replaces the copying, not the judgment. A pursuit selects the people and projects it needs, and the documents are generated from the records in the format the solicitation asks for. When someone earns a registration or a project closes out, the record changes once and the next pursuit uses it.

One pursuit: six key people and ten example projects, sixteen documents
Copied from the last submittal: 30 to 60 minutes each. 8 to 16 hours
Generated from records: Under a minute each. Under 20 minutes

Assembly time only. Writing the approach and reviewing the package stay with your team either way.

What you get

What a civil engineering firm gets from RFPM

One profile per engineer, every resume format

Education, registrations by state, certifications, and project history with roles live in one profile. Each pursuit picks the projects to highlight and generates the resume in the firm's own template (Word or InDesign), an SOQ layout, or SF330 Section E.

How resume management works

Project experience sheets from project records

Scope, client and agency, contract value, completion date, delivery method, and the staff who worked on the project are stored once. Sheets export to Word for SOQ, state DOT prequalification, and SF330 Section F formats.

How project sheets work

A recommended team, then a first draft

Ask RFPM Agent recommends the staff and projects for a pursuit, with the records behind each; your team makes the selection. RFPM then writes the first draft in your template, and your team reviews and edits it.

How the recommendation works

A qualifications library for the text that repeats

Firm overview, QA/QC approach, safety record, and past-performance narratives are stored as reusable content and pulled into pursuits, so the approved version is the one that ships.

The content library
Solicitations

Solicitations civil engineering firms use it for

SolicitationWhat it asks forWhat RFPM generates
Municipal or county SOQFirm qualifications, key personnel resumes, relevant projects, referencesResumes and project sheets in the firm's template
RFQ responseTeam organization, resumes with project roles, similar-project experienceTailored resumes and project sheets per pursuit
State DOT prequalificationStaff registrations and experience by work category, firm project historyResumes and project sheets in the DOT's format
On-call or IDIQ contractBench of staff across disciplines, breadth of project experienceResume and project sheet sets for the full bench
Federal SF330Section E resumes, Section F example projects, Section G matrix, Section HSections E and F; G and H stay with your team

Working on a federal pursuit? How RFPM handles the SF330.

Questions

Frequently asked questions

What kind of civil engineering firm is RFPM built for?
Firms of 15 to 200 staff that win work through qualifications-based selection: municipal and county SOQs, RFQ responses, state DOT prequalification packages, on-call contracts, and SF330 submittals. One or two people usually handle every proposal, and the same staff and project material is rebuilt for each one. RFPM is not a general RFP tool for software, IT, or other firms outside architecture, engineering, and construction, and it is not a fee-proposal or e-signature tool.
What does RFPM produce for a civil engineering pursuit?
Tailored key-personnel resumes and project experience sheets, generated from one structured record per person and per project. Resumes export into the firm's own Word or InDesign template, SOQ formats, or SF330 Section E. Project sheets export to Word for SOQ, state DOT, and SF330 Section F formats. RFPM also writes the first draft in your template, suggests the people and projects, and your team reviews and edits. Reusable qualifications content lives in a library, and Ask RFPM Agent answers questions from the firm's own records with the source linked.
Does RFPM pick the team and projects for a pursuit?
It recommends them. Ask RFPM Agent recommends the staff and projects for a pursuit, with the records behind each; your team makes the selection. Nothing is added to a pursuit without a person confirming it.
How is this different from proposal software built for sales teams?
Sales proposal tools are built to produce a priced offer and collect a signature. Civil engineering firms are selected on qualifications before price, so the work is assembling evidence: who worked on what, when, for which agency, and at what contract value. RFPM stores that evidence as structured data and generates the documents each pursuit asks for. It does not do fee proposals, e-signatures, or subcontractor bid management.
How long does setup take?
Staff profiles and project records are loaded from the firm's existing resumes and project sheets during onboarding, and custom templates are set up with the firm at the same time. Most firms are generating documents within days. The first paid month is the evaluation: the proposal team runs a real pursuit on its own records, then decides.

Start a pilot

Bring a real submittal. We will run it on your data.

Thirty minutes on a pursuit your team is chasing this quarter. You will see the resumes and project sheets come out of your own records. If the fit is not there, we will tell you.